Sanitary System
Installation Service

Sanitary System Installation Service

A properly designed sanitary system is the backbone of any construction project—whether it’s a residential home, commercial building, factory, or renovation. Without a reliable foundation, issues can arise that lead to costly damage in both time and budget.

Our team of experienced professionals provides a complete, end-to-end service—from system design → installation → inspection → performance testing—ensuring your clean water and wastewater systems operate at maximum efficiency.

Our Team Designs and Manages Your Sanitary Systems

Our team of experienced professionals specializes in sanitary system design and installation for residential homes, commercial buildings, and large-scale projects. We ensure that every step is carried out in accordance with engineering standards, delivering reliability and long-term performance.

Water Supply System

  • Installation of water supply pipelines into the building
  • Main and branch piping system installation
  • Installation of water storage tanks, pumps, and control valves
  • Selection of standard-quality materials such as PVC, PP-R, and HDPE

Wastewater System

  • Design of internal drainage systems within the building
  • Installation of wastewater pipelines from bathrooms, kitchens, and laundry areas
  • Installation of septic tanks or wastewater treatment systems
  • Prevention of common issues such as pipe blockages, odor backflow, and leakage

Storm Drain System

  • Installation of rainwater drainage piping in accordance with standards
  • Design of rainwater inlets, gutters, and main drainage lines
  • Prevention of water accumulation and flooding around the property

Inspection & Testing

Modern facility design should also incorporate sustainable solutions, including clean energy systems such as solar panel installations, as well as energy-saving and efficient energy management systems. These not only help reduce energy costs but also enhance long-term operational efficiency and environmental sustainability.

FAQ’s

Frequently Asked Questions

What is the minimum budget required to build a house?

The budget depends on several factors, including the size of the house, materials used, and location.
On average, construction starts from approximately THB 2–3 million for a standard home built on a 50 sq.w. plot in suburban Bangkok, using standard materials.

As of 2026, construction permits can be submitted online via the BMA OSS system (for buildings not exceeding 2,000 sq.m. and 5 floors).
If all documents are complete and approved, results are typically issued within 14 days.

For submissions through local administrative offices (Subdistrict Administrative Organization, Municipality, or District Office), the process takes up to 45 days, provided all documents are correct and no revisions are required.

Required documents include:

  1. Architectural and Engineering Drawings (Complete Set)

    • Architectural, structural, electrical, and plumbing plans

    • Signed by licensed architects and engineers

  2. Copy of Land Title Deed (Nor Sor 4 or equivalent)

    • Certified true copy

    • All pages must be included

  3. Letter of Consent for Construction (if the landowner is not the applicant)

    • Along with a copy of the landowner’s ID

  4. Copy of Applicant’s ID Card

  5. Power of Attorney (if someone submits on your behalf)

    • With a copy of the representative’s ID

  6. Construction Permit Application Form (Form A.1)

    • Available at district offices or via the BMA online system

Construction time depends on the size and complexity of the project.
For example, a typical 2-storey house takes approximately 10–12 months to complete.

Contractors typically charge either per square meter or as a lump-sum contract.
As of 2025, the average cost for reinforced concrete residential construction is around
THB 22,000 – 30,000 per sq.m., depending on material specifications.

Review their past projects, ensure a formal contract is in place, and confirm that work stages and payment schedules are clearly defined.

Key areas that should prioritize higher-quality materials include:

  • Structural components

  • Electrical and plumbing systems

  • Thermal insulation materials

Planning ahead for solar panels or smart home systems is also recommended, as it is more cost-effective than retrofitting later.

Yes. By law, qualified professionals must supervise construction.
For example:

  • Structural engineers must approve load calculations for columns and beams

  • Electrical engineers must oversee electrical system installations

Develop detailed plans and use contracts that clearly specify materials.
A reliable contractor will provide a complete breakdown, including models, specifications, quantities, and installation costs (e.g., brand, model, unit price, installation fee).

This allows homeowners to review and adjust materials before construction begins, ensuring the project stays within budget.

It is not mandatory but highly recommended, as it protects against potential damage during construction.
If financing is obtained through a bank, insurance (such as fire insurance) is typically required and included in the loan.

Typically:

  • Structural work: 5–10 years
  • General work: 2–3 years

9 STRAIGHT
From Foundation to Finish — By Us

With over 20 years of experience in construction — from homes and factories to condominiums — we have consistently earned our clients’ trust through honesty and transparency in every project. We are the reliable choice when you’re ready to build your home.

Turnkey Construction Services Nationwide Homes, buildings, offices, condominiums, warehouses, and factories — delivered by a professional team you can trust.